Thursday, December 29, 2011

12/29/11

One final post in 2011. I had an amazing time in Africa and hopefully I(we)'ll be going back soon. We have not yet passed court, but we anticipate we'll receive that news soon. Back in Charlevoix, the roof is on the new house and the windows are in. The siding should be going up shortly and the heating and plumbing has already begun on the interior.


Looking out the dining room window from the kitchen
It really looks like a house now. As you can see the driveway is much more defined now as well.

The house looks huge from the back.

Bathtub in the master bath


The kid's bathtub/shower

Monday, December 5, 2011

12/5/11

It's been a little while since we've posted, so here's a few pictures taken this afternoon. The roof is just about up and somehow we have yet to get any snow. Life is hectic in Charlevoix, so the posts may be more spread out for a while. I'm set to leave for Ethiopia next week Friday and am extremely anxious to meet our little girl.








Tuesday, November 22, 2011

11/22/11

The trusses are up and we should have a roof soon.



Rear view




Front View

Wednesday, November 16, 2011

Random Addy Videos




11/16/11

A month from today we'll begin our journey to Africa. The house has become some what of an after thought over the past few weeks, but the work continues.

The trusses have been delivered and will be going up on either Friday or Monday. You probably guessed this, but those white specks are snowflakes. And yes, I biked there in the snow.
The second floor is finally taking shape. The exterior was framed in today and tomorrow the interior walls should go up and we will be able to get a sense of the girls' rooms.

Further proof of the white stuff.


Rear view of the house. Hopefully Addy isn't afraid of heights because her room is way up top.

Saturday, November 12, 2011

11/12/11

It's been a while since our last post. The guys lost three days of work this week to the weather. We are also finding it's hard to get to the house on weekdays before it's too dark out. In other news, we received notification of our court date in Ethiopia on Dec. 22. We spent the last few days booking tickets and are excited to mark our calendars with the day we get to meet our little girl!

The garage is up, which totally transforms the look of the front.

Addy was happy to be back at the "new new house" after a week away.
An aerial shot of Addy taken from the back deck.

The back deck is finally perfect. It took the guys a while to get everything just right.

Checking out the view from our outdoor living space.

The garage from the west.

Wednesday, November 2, 2011

November is here

Not a whole lot to show since the last post. The guys have been working hard on getting the back deck perfect. The back deck supports the second floor and is over 50 feet long so it is important that it is perfectly level. The trusses have been ordered and are scheduled to be delivered in a week.

A side view of the deck
The larger portion of the deck seen here will be the screened porch.

The garage floor was poured late last week. The guys threw a tarp up in case it rained while it was still drying.

The basement stairs have been added as well.


Wednesday, October 26, 2011

Day 59

Almost two months in. The second floor has been started. Before they can really get into the second floor the back deck needs to get up since it helps support the second floor.


Here's what you'll see as you drive up the driveway. It doesn't look nearly as big from the front.
The holes for the deck posts that will help support the second floor.

Some fall colors still remain.

The garage floor is all set to be poured. Now we just need the weather to allow that to happen.

Side view. You can see some of the floor joists for the second floor if you look closely.


Saturday, October 22, 2011

Another good week

Another week down. The main level is now framed in. Next week they'll start going up to the second floor. I've also tried adding a couple videos.


Halloween has come early in the Wiers house.
The main level is completely framed in. This view is from the great room looking across towards the dining room.A view of where the front door will be. The blocks for the garage are now being stacked on the right hand side of the picture. Hopefully the garage floor will be poured next week.


Looking up from the walkout side. It's crazy to think that we're still going up one more level.








Monday, October 17, 2011

More Progress

After a weekend of some nasty weather things cleared up a bit, so Monday saw another day of good progress. Nearly half of the perimeter of the main floor is now framed in. Things are definitely beginning to take shape.


A look at Addy's favorite place, the hill leading down to the backyard. Who new that running up and down a hill could be so fun. From the backyard looking up you can see the progress on the main level.

Daddy and Addy scoping out the progress.


The garage floor will hopefully be laid soon. The trench is for the garage footings. You can see that the front wall of the house is pretty much in place.

Tuesday, October 11, 2011

Moving on up

Before we get to the updated house pictures let's get to the important stuff. Yesterday morning we received a referral for a beautiful 10 month old girl. She appears to be a very healthy young girl and we can not wait to get her home. She has been described as fast, strong, and energetic, so hopefully she'll be able to hold her own with Addy. Now the race is on to see what happens first-the house gets finished or we bring home our little girl.

The walkout viewed from the backyard
Addy playing in the leaf filled basement. The one interior wall you see will be one end of the staircase.

The foam has been waterproofed and should be covered up with dirt/sand soon.


Up at the front of the house you can see we're nearly ready to start going up another level.

Saturday, October 8, 2011

Framing has begun

We anticipated great things this week. With great weather a lot of work has been accomplished. The mason wasn't able to get a load of concrete until Tuesday and it took a little longer for the concrete to dry than expected, but it was still a very productive week.

This is taken Wednesday a day after the floor was poured. Not much framing was done waiting for the concrete to dry.

Thursday we arrived to this sight. Not bad, huh?
Addy, peaking through Oma and Papa's bedroom window. The room is going to be smaller than we anticipated to allow more room for the mechanical room in the back corner.

More progress on Friday. They're hoping to start laying the floor joists for the main floor on Monday. As you can see the leaves have started to fall. Hopefully, we'll have a roof before snow starts to fall!

Monday, October 3, 2011

Great weather this week -- expecting great things!

The basement floor should be poured tomorrow. We can start to visualize our backyard. Things are coming along. The weather forecast is good this week. They should start framing in on Wednesday. Still no word on our referral.....


The ground floor is ready for the concrete to be poured.


In the background on the right you can see the plumbing for the basement.


The framing in of the south side wall (open area) will begin this week.

Addy in awe of the excavator



The Wierses